
<!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd">
Distributions must be entered for PPE 6/25/09 by noon 6/26/09 to avoid no-pay status for emp with missing distribs. Dept lockout of distrib component starts at noon on 6/26/09. No new FY09 distribs may be added after this date by depts<br>
6/26/2009 12:00:00 PM<br>
6/26/2009 12:00:00 PM<br>
Distributions must be entered for PPE 6/25/09 by noon 6/26/09 to avoid no-pay status for emp with missing distribs. Dept lockout of distrib component starts at noon on 6/26/09. No new FY09 distribs may be added after this date by depts<br>
<br>
BEGIN:VCALENDAR
VERSION:1.0
BEGIN: VEVENT
DTStart:20090626T120000Z
DTEnd:20090626T120000Z
SUMMARY;ENCODING=QUOTED-PRINTABLE:Distributions must be entered for PPE 6/25/09 by noon 6/26/09 to avoid no-pay status for emp with missing distribs. Dept lockout of distrib component starts at noon on 6/26/09. No new FY09 distribs may be added after this date by depts
DESCRIPTION;ENCODING=QUOTED-PRINTABLE:
Location;ENCODING=QUOTED-PRINTABLE:
UID:10820090626T120000ZDistributions must be entered for PPE 6/25/09 by noon 6/26/09 to avoid no-pay status for emp with missing distribs. Dept lockout of distrib component starts at noon on 6/26/09. No new FY09 distribs may be added after this date by depts
PRIORITY:3
End:VEVENT
End:VCALENDAR
